From the course: Construction Industry: Techniques and Technology
Unlock the full course today
Join today to access over 22,600 courses taught by industry experts or purchase this course individually.
Exploring productivity at the workface - Bluebeam Tutorial
From the course: Construction Industry: Techniques and Technology
Exploring productivity at the workface
- Hi, Jim Rogers here, and I'm back this week to continue or deep dive into construction productivity issues. This week I'm going to narrow the focus and look directly at what we call productivity at the workface. This is really just another way of saying actual manpower productivity. We already talked a little bit about the time we lose when we add time in our schedule in between our trades. That's just dead time. Nothing happens. But the clock's ticking. Well, the reason that time gets added is that when the general contractor's producing a construction schedule, they're working to give their best guess at how long an activity will take. Now that should certainly be an educated guess, but sometimes even the best of plans runs into problems. And problems on a construction site tend to translate to delays. Let's look at a typical scenario. When a trade contractor bids a job, they do their best to anticipate conditions and estimate the labor and the equipment demands. As a project…
Practice while you learn with exercise files
Download the files the instructor uses to teach the course. Follow along and learn by watching, listening and practicing.
Contents
-
-
-
(Locked)
Digital construction drawings: It's time12m 9s
-
(Locked)
BIM 360 Docs for digital drawings19m 9s
-
(Locked)
Using Procore to manage digital drawings17m 45s
-
(Locked)
PlanGrid: Digital drawings in the palm of your hand9m 45s
-
(Locked)
Using Bluebeam Revu to do takeoffs15m
-
(Locked)
Using Fieldwire for plans in the field7m 36s
-
(Locked)
Using Adobe Acrobat to mark up drawings18m 59s
-
(Locked)
Introducing digital management7m 33s
-
(Locked)
Considerations for going digital9m 17s
-
(Locked)
Planning revisions in a digital environment with Procore8m 51s
-
(Locked)
Improving the punch list process with Procore8m 58s
-
(Locked)
Changing the way RFIs are handled with PlanGrid7m 1s
-
(Locked)
Collaborating outside your team6m 22s
-
(Locked)
It's time to evolve9m 43s
-
(Locked)
What is near-miss data and why care?9m 35s
-
(Locked)
Safety, quality, and productivity are linked8m 58s
-
Productivity in construction8m 44s
-
(Locked)
Reducing time from concept to procurement13m 41s
-
(Locked)
Exploring project productivity9m 36s
-
(Locked)
Exploring productivity at the workface5m 50s
-
(Locked)
Improving productivity through reliability6m 38s
-
(Locked)
Productivity with timely information5m 37s
-
Safety in construction: Introduction to the issues5m 23s
-
(Locked)
An example of planning for safety7m 19s
-
Jobsite safety: Hazard awareness5m 20s
-
(Locked)
Jobsite safety: Issues for project managers5m 14s
-
(Locked)
Resolving safety issues between the trades4m 45s
-
(Locked)