From the course: InfraWorks 2020 Essential Training
Unlock the full course today
Join today to access over 22,600 courses taught by industry experts or purchase this course individually.
Commercial parking, part 2 - InfraWorks Tutorial
From the course: InfraWorks 2020 Essential Training
Commercial parking, part 2
- [Instructor] Okay, so we have our pavement. Because this line work wasn't closed it thinks it's another coverage area in the middle, but it's not. All right, now I'm going to bring in our striping that represents the pavement. So back into our control panel. You can hit Alt+1 to open up control panel. So you don't actually have to go to the intelligence tool. To pull down, select STF, and we're going to browse some into our dataset under site planning and GS data and select 'striping.' So propose commercial striping and open, we're going to configure this by just double-clicking. Now the striping has not enclosed the line-work, in AutoCAD it was a single line or poly-line, but it's not enclosed object it doesn't close on itself, so I'm going to select 'Coverage Areas', and I'm going to select a color white for the striping, so under 'Style', 'Color' tab, select 'White', hit 'OK', and under 'Source', make sure it is 'Drape',…
Practice while you learn with exercise files
Download the files the instructor uses to teach the course. Follow along and learn by watching, listening and practicing.
Contents
-
-
-
-
-
(Locked)
Property parcels and easements2m 30s
-
(Locked)
Zoning theme2m 30s
-
(Locked)
Land use theme2m 54s
-
(Locked)
Residential subdivision lots, part 14m 3s
-
(Locked)
Residential subdivision lots, part 23m 5s
-
(Locked)
Residential subdivision lots, part 34m 35s
-
(Locked)
Commercial parking, part 14m 17s
-
(Locked)
Commercial parking, part 24m 56s
-
(Locked)
-
-
-
-
-
-
-
-