Earned value s-curves - Primavera Tutorial
From the course: Advanced Primavera P6
Earned value s-curves
- [Instructor] To show your earned value S-curves, you need to make sure that some settings are already in place. You can go to the Projects tab and ensure the project is selected. Now, in the Sentence tab, you're able to see that the baseline for earned value calculations is set to the project baseline. Ensure that you don't need to change it to the primary baseline. Another option is to go to the Admin, Admin Preferences, and here you're able to see some other settings based on the Earned Value tab. As far as the earned value calculation, I currently have it set as At Completion values with current dates. You will see other options available. Once you've ensured that this is correct, you can go back to your Activities window and select the Activity Usage Profile. Here, you're able to right-click in the profile and go to the Options. You will notice below there are some earned value curve options. I'm going to go ahead and select those so we can see what they look like. So I hit…
Practice while you learn with exercise files
Download the files the instructor uses to teach the course. Follow along and learn by watching, listening and practicing.
Contents
-
-
-
-
Converting a baseline to a project39s
-
(Locked)
Converting a project to a baseline40s
-
(Locked)
Updating the project baseline1m 12s
-
(Locked)
Activity usage spreadsheet16s
-
(Locked)
Resource Usage spreadsheet36s
-
(Locked)
Resource histograms and S-Curves42s
-
(Locked)
Activity histograms and S-Curves29s
-
(Locked)
Earned value s-curves1m 10s
-
(Locked)
Leveling resources1m 8s
-
(Locked)
Activity codes1m 25s
-
(Locked)
User defined fields (UDFs)51s
-
(Locked)
Global changes1m 8s
-
(Locked)
Opening multiple projects33s
-
(Locked)
Set a default project for multiple projects21s
-
(Locked)
Setting baselines for multiple projects59s
-
(Locked)
Calculating multiple float paths57s
-
(Locked)
Displaying multiple float paths37s
-
(Locked)
Performance measurement baseline1m 4s
-
(Locked)
Create financial periods42s
-
(Locked)
Store period performance1m 13s
-
(Locked)
Timescaled logic diagram50s
-
(Locked)
Schedule comparison in visualizer1m 5s
-
-