Resource Usage spreadsheet - Primavera Tutorial
From the course: Advanced Primavera P6
Resource Usage spreadsheet
- [Narrator] To display the Resource Usage Sheet, you can do so by selecting the Resource Usage Spreadsheet icon. Now you will see below that I am showing my Current Project Resources. If you don't see this, you can select the Display dropdown go to Filter By and select Current Project Resources. You then want to select Resource for the option Display Activities for selected, which is in the bottom-left corner of your screen. This will display only the activities assigned to this resource. If you'd like, you can increase the timescale to a daily interval. That was easy, right?
Practice while you learn with exercise files
Download the files the instructor uses to teach the course. Follow along and learn by watching, listening and practicing.
Contents
-
-
-
-
Converting a baseline to a project39s
-
(Locked)
Converting a project to a baseline40s
-
(Locked)
Updating the project baseline1m 12s
-
(Locked)
Activity usage spreadsheet16s
-
(Locked)
Resource Usage spreadsheet36s
-
(Locked)
Resource histograms and S-Curves42s
-
(Locked)
Activity histograms and S-Curves29s
-
(Locked)
Earned value s-curves1m 10s
-
(Locked)
Leveling resources1m 8s
-
(Locked)
Activity codes1m 25s
-
(Locked)
User defined fields (UDFs)51s
-
(Locked)
Global changes1m 8s
-
(Locked)
Opening multiple projects33s
-
(Locked)
Set a default project for multiple projects21s
-
(Locked)
Setting baselines for multiple projects59s
-
(Locked)
Calculating multiple float paths57s
-
(Locked)
Displaying multiple float paths37s
-
(Locked)
Performance measurement baseline1m 4s
-
(Locked)
Create financial periods42s
-
(Locked)
Store period performance1m 13s
-
(Locked)
Timescaled logic diagram50s
-
(Locked)
Schedule comparison in visualizer1m 5s
-
-