Setting baselines for multiple projects - Primavera Tutorial
From the course: Advanced Primavera P6
Setting baselines for multiple projects
- [Instructor] To set baselines for multiple projects, you can do so by opening the Maintain Baseline form. Here, you will notice that one of the project already has a baseline. You can add a new baseline by selecting both projects, select Add, and you have a choice to Save a copy of the current project as a new baseline or Convert another project to a new baseline of the current project. I'll keep it as is and select OK. You now notice that both projects have a new baseline. The next step is to assign a specific baseline to the project. Under the Project, you can select a specific project, and for the Project Baseline, you can actually select a baseline associated with that project. Do keep in mind that the current project baseline displays the plan dates from the current schedule, and this will noW be shown as a baseline.
Practice while you learn with exercise files
Download the files the instructor uses to teach the course. Follow along and learn by watching, listening and practicing.
Contents
-
-
-
-
Converting a baseline to a project39s
-
(Locked)
Converting a project to a baseline40s
-
(Locked)
Updating the project baseline1m 12s
-
(Locked)
Activity usage spreadsheet16s
-
(Locked)
Resource Usage spreadsheet36s
-
(Locked)
Resource histograms and S-Curves42s
-
(Locked)
Activity histograms and S-Curves29s
-
(Locked)
Earned value s-curves1m 10s
-
(Locked)
Leveling resources1m 8s
-
(Locked)
Activity codes1m 25s
-
(Locked)
User defined fields (UDFs)51s
-
(Locked)
Global changes1m 8s
-
(Locked)
Opening multiple projects33s
-
(Locked)
Set a default project for multiple projects21s
-
(Locked)
Setting baselines for multiple projects59s
-
(Locked)
Calculating multiple float paths57s
-
(Locked)
Displaying multiple float paths37s
-
(Locked)
Performance measurement baseline1m 4s
-
(Locked)
Create financial periods42s
-
(Locked)
Store period performance1m 13s
-
(Locked)
Timescaled logic diagram50s
-
(Locked)
Schedule comparison in visualizer1m 5s
-
-